Greenock Oakmall shopping center has been experiencing cases of flooding during severe rainfall, Scottish Water raised a multimillion pound investment project, delivered by ABV, to help alleviate this flooding.

Scope
We were engaged by ABV to supply two Modular Assembly Framework package plant CSOs built offsite in the our factory base at Cumbernauld and electrical, telemetry and commissioning services to put these into service.

Our Service and Delivery
We delivered the package plants to the client, at the time they were required on site. Both CSOs were installed and commissioned in an exceptional 8 days, with the telemetry commissioning following 6 days later. It was a good example of a collaborative approach with all parties working well to the same goal.

  • Client: Amey Black & Veatch
  • Services: Modular Assembly Framework, Electrical and Telemetry
  • Sector: Water & Utilities

“Site install went well, safely and in a timely fashion with few snags, and response to site issues was good. The Install was tested in time to meet Commissioning and Telemetry dates. The communication with site teams pre-install was a key part.”
- Project Manager, ABV M & E