This project was commissioned to provide wastewater transport from a new 3000 home development at Bertha Park, Perth under the River Almond to the break pressure chamber before discharging into Scottish Water network.

Scope
We were engaged to; design, supply, install mechanically/ electrically and commission the Modular Assembly plant. Restricted flows by Scottish Water into the downstream network provided a challenge in that the emergency storage required was 50m3, this was designed and implemented by our partners I&C Solutions in a large storage tank, 3.6m dia x 21.5m long in dimensions

Our Service and Delivery
We delivered the detailed design of the pumping station and liaising directly with the client and Scottish Water Fully built in house MCC control panel complete I&C supplied storage tank DOL Pumps installed with 80mm discharge pipework, including all valves and instrumentation. Full installation and commissioning of the station Installation, configuration and testing of on-site telemetry Provision of the operation and maintenance manual to Scottish Waters requirements

  • Client: Springfield Properties
  • Services: Modular Assembly Framework
  • Sector: Development Market

“Springfield Properties Plc engaged with and employed IDS to design, install and commission a pump station for our 3000 homes development at Bertha Park, Perth, Perthshire. From my initial meetings with their Project Team, I have been very impressed with their professionalism, technical knowledge, and understanding of our requirements. The team, especially Greig Barr was very approachable and helpful if our groundworks contractor had any queries or require guidance when preparing for the installation of the pump station. The pump station has been up and running for a few months with no issues. Overall I have been very impressed with IDS and we will be using IDS for our future developments.”
- Pre Construction Manager, Springfield Properties