First time telemetry integration with GSM comms.
- Supply, installation, configuration, testing and commissioning of a new ATU 800 GSM RTU (Mains Powered) to the Telemetry 633 specification.
- No enclosure is required, the RTU will be mounted directly on to the kiosk backboard.
- Provision of a GSM antenna (internal/external mounting to be decided when kiosk construction is confirmed).
- Telemetry System database configuration and mimic production to Scottish Water Open Enterprise.
Services Provided:
- Supply Install and commission the new Xlyem ATU 800 GSM outstation.
- Configure existing top end top incorporate new signals.
- Full end to end test of signals from the new dosing kiosk
- O&M manuals and drawings
Client: Scottish Water
Disciplines Involved: Telemetry Engineer, Installation Engineer, Commissioning Engineer
Business Sector: Telemetry Department