First time telemetry integration with GSM comms.     

  • Supply, installation, configuration, testing and commissioning of a new ATU 800 GSM RTU (Mains Powered) to the Telemetry 633 specification.
  • No enclosure is required, the RTU will be mounted directly on to the kiosk backboard.
  • Provision of a GSM antenna (internal/external mounting to be decided when kiosk construction is confirmed).
  • Telemetry System database configuration and mimic production to Scottish Water Open Enterprise.

Services Provided:

  • Supply Install and commission the new Xlyem ATU 800 GSM outstation.
  • Configure existing top end top incorporate new signals.
  • Full end to end test of signals from the new dosing kiosk
  • O&M manuals and drawings

Client: Scottish Water

Disciplines Involved: Telemetry Engineer, Installation Engineer, Commissioning Engineer

Business Sector: Telemetry Department